|
|
|
| Chemical and Gas Manufacturers Group Information
|
|
|
|
|
| |
|
|
- CGMG SMTF Overview (48KB PDF)
January 2008
A “Ship to Control” supply position is a growing expectation of material suppliers to the IC manufacturing industry. SEMI has adopted standard guidelines for suppliers to follow in developing control limit calculation procedures that can be used as a basis for lot approval procedures.
|
- CGMG Wants to Hear from You
The CGMG identifies opportunities where member companies and other partners can work together on a pre-competitive basis to reduce redundance or duplication of efforts, or to establish standards that will benefit the industry. If you have a topic you would like the CGMG to address please click here.
|
|
|
|
|
| Ship to Control Process Limits (853KB PDF) In recent years there has been a growing push by IDM’s to require suppliers to
provide materials that are in statistical control. When a material is not in
statistical control and within the nominal material specifications there are several
possibilities.
|
|
|
|
|
|
 |
|
 |
|
|
|
|
|
|
| Silicon Manufacturers Group
|
|
|
|
|
| |
|
|
 |
|
 |
|
|
|
| Silicon Manufacturers Group Information
|
|
|
|
|
| |
|
|
 |
|
 |
|
|
|